Information checked on 21 October 2026
Ghaziabad localities near the Delhi–Ghaziabad–Meerut Namo Bharat (RRTS) corridor. NCRTC names the urban nodes on the line as Anand Vihar, Sahibabad, Ghaziabad, Murad Nagar and Modi Nagar (NCRTC).
The 82.15 km Delhi–Ghaziabad–Meerut corridor, including 23 km of Meerut Metro, was dedicated to the nation on 22 February 2026 and is fully operational (PMO; PIB). Status: operational. Ghaziabad station is an integration point with railway, metro and bus services (PMO).
PIB states that transit-oriented development (TOD) zones along the corridor are notified in the Ghaziabad master plan. Status: approved (notified).
Check whether a plot falls within a notified TOD zone and what that means for permitted use and density. Verify UP RERA registration (up-rera.in), GDA approvals, title and dues before buying. Take independent professional advice where needed.
Infrastructure dates are official or reported targets and may change. This page is general information, not a guarantee, and is not a legal opinion on any property.