Information checked on 21 October 2026
Raj Nagar Extension (RNE), the Ghaziabad locality at the northern end of the Hindon elevated road (Hindustan Times).
The 10.3 km, four-lane, signal-free Hindon elevated road links RNE with UP Gate on the East Delhi border. It opened on 30 March 2018 (Hindustan Times). Status: operational. Two new ramps, at Kanawani (Indirapuram) and at Vasundhara, have been approved and funded. GDA expects them to take about 18 months once work starts (Times of India; Hindustan Times). Status: approved.
In October 2025 the state approved the widening and upgrading of three zonal-plan roads in RNE (Hindustan Times). Status: approved. GDA's board has cleared funding for a 6 km, six-lane embankment road along the Hindon near RNE; a DPR is pending and construction is expected to take about three years after that (Hindustan Times). Status: approved (funding). GDA has proposed a 3.5 km, four-lane elevated road from the RNE crossing to Morti to carry through traffic to the Delhi–Meerut Road (Hindustan Times). Status: proposed.
Hindustan Times reports peak-hour congestion on RNE's four-lane main road, and the proposed elevated road is not yet approved. Verify title, land records, GDA master-plan land use and UP RERA registration (up-rera.in) where applicable, and take independent professional advice where needed.
Infrastructure dates are official or reported targets and may change. This page is general information, not a guarantee, and is not a legal opinion on any property.