Our website is currently undergoing maintenance and upgrades. Some pages or features may change or be briefly unavailable. Thank you for your patience. Questions? realtorsinvestica@gmail.com

Dwarka Expressway, Gurugram

Information checked on 21 October 2026

Overview

The Dwarka Expressway is about 29 km long, of which about 18.9 km is in Haryana (The Hindu).

Connectivity

The eight-lane Haryana section (about 19 km) was inaugurated on 11 March 2024, in two packages: Delhi–Haryana border to Basai ROB (10.2 km) and Basai ROB to Kherki Daula (8.7 km), with links to IGI Airport and the Gurugram Bypass (PIB). Status: operational.

Infrastructure and planned projects

Gurugram Metro Phase 1 construction includes a spur to Sector 101 near the expressway (Hindustan Times). Status: under construction.

Things to consider

Metro timelines are reported targets and can change. Verify HRERA Gurugram registration (haryanarera.gov.in), the DTCP licence, occupancy certificate and the developer's marketing authorisation before buying. Take independent professional advice where needed.

Sources

  1. https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=2013129
  2. https://www.thehindu.com/news/national/pm-modi-opens-haryana-section-of-dwarka-expressway-lays-foundation-stone-for-114-nh-projects-worth-1-lakh-crore/article67938445.ece
  3. https://www.hindustantimes.com/cities/gurugram-news/haryana-clears-1-662-crore-tender-for-gurugram-metro-phase-2-construction-101790826355022.html

Infrastructure dates are official or reported targets and may change. This page is general information, not a guarantee, and is not a legal opinion on any property.