Old Gurugram Metro Corridor, Gurugram

Information checked on 21 October 2026

Overview

Old Gurugram sectors along the planned Millennium City Centre to Sector 9 and Sector 9 to Cyber City metro (Hindustan Times; GMRL).

Infrastructure and planned projects

Gurugram Metro Phase 1 runs about 15 km from Millennium City Centre to Sector 9 with 13 stations, plus a spur to Sector 101. Construction began in September 2025 and was reported about 15% complete, with the cost revised to ₹10,266 crore (Hindustan Times). Status: under construction. Phase 2 is a 15.3 km, 14-station elevated corridor from Sector 9 to Cyber City (Hindustan Times). GMRL's tender GMRL/PROJ/2026/AC-03 for its viaduct and stations is valued at about ₹1,662.53 crore including GST, with a 30-month completion period and bids due 18 November 2026 (GMRL). Status: tendered.

Things to consider

Expect construction disruption on Old Delhi Road and at Bajghera (Hindustan Times). Metro dates are targets and can change. Verify HRERA Gurugram registration (haryanarera.gov.in), title, approvals and occupancy certificates, and take independent professional advice where needed.

Sources

  1. https://www.hindustantimes.com/cities/gurugram-news/haryana-clears-1-662-crore-tender-for-gurugram-metro-phase-2-construction-101790826355022.html
  2. https://www.gmrl.org.in/Downloads/Tender/Tendernotice_05102026.pdf

Infrastructure dates are official or reported targets and may change. This page is general information, not a guarantee, and is not a legal opinion on any property.

Old Gurugram Metro Corridor, Gurugram: locality guide | Investica Realtors